After years of accumulation and development, the company has contracted 14000 end users energy efficiency management projects
As far as the basic requirements for electricity use on construction sites are concerned, the problems faced by the leakage protection equipment of the construction site when put into use are discussed, and improvements are made at the same time. This can
In recent years, the rate of installation, commissioning and and operation qualification rate of total protectors have gradually increased,and the installation rate and commissioning rate of household leakage protectors in rural households have also been
With the further acceleration of my country’s economic development, people’s living standards have also been continuously improved, and residents’ electricity consumption has been continuously increased.While various household appliances have facilitated
Through the analysis of the ground fault of the ocean platform, this paper discusses the necessity of installing the leakage protector on the handheld and mobile electrical equipment of the ocean platform, and briefly describes the working principle of th
This paper mainly introduces the application of Acrel DC energy meter in a solar panel company in Italy.Acrel DJSF1352-RN DC energy meter is mainly used for measuring and monitoring of DC signal equipment such as batteries on the DC side of the PV projec
Customers need to collect the basic energy consumption data and upload it to management system so that they can realized real-time and remote data monitoring using their PC
It is mainly used for the measurement of the output energy in the UPS system, and the measurement, communication and control of the circuit system through the Hall sensor.
Single-phase prepaid public meters and three-phase prepaid public meters are new prepaid electric energy meters that integrate measurement and control. They support radio frequency recharge and remote recharge, and have multiple control modes such as pay
A data center company in South Africa contacted our company to look for a single energy meter. After making clear the project requirements, it adopted the single energy meter ADL10-E to collect data, and then transmitted the data to the platform through t
We will contact you within 24 hours.