EN  

Overcoming adversity together with Zhengzhou

Time: 29 July 2021  |   Source: Acrel

 

Severe weather has caused massive floods in Henan, with nearly a year's worth of rain falling in just three days.  The arrival of heavy rainfall directly caused the flood disaster in many places in Henan Province, the city waterlogging is serious, shopping malls, subway many places flooded.  

After the flood, Acrel immediately set up technical, production and service teams to provide materials and services for post-disaster reconstruction in Henan, and to assist in restoring power supply in the affected areas in Henan.  

Anti - flood reconstruction a long way to go, Acrel in action! 


Rescue and disaster relief: assisting Zhengzhou metro Line 3 and Line 4

Since July 17th, Zhengzhou City has experienced a series of rare and heavy rainstorms, causing water accumulation in the Zhengzhou subway. On July 20, the heavy rain at the F exit of Dongshilipudi Station of Henan Metro Line 4 directly turned the entire subway station into a "Water Curtain Cave". Zhengzhou Metro launched an emergency response mechanism to evacuate passengers. The disaster situation is the order, and the disaster relief is the responsibility. In order to make it easier for citizens to travel, Zhengzhou Metro Line 3 and Line 4 have all started to resume work recently, and strive to realize the normal operation of Metro Line 3 and Line 4 as soon as possible. On the afternoon of July 24, Acrel received a call from relevant departments in Henan and responded immediately after learning about the specific disaster area and arranged for team docking. Cooperate with Zhengzhou Metro Line 3 and Line 4 to formulate power emergency repair plans, and provide Acrel power monitoring and electrical fire product solutions.

Support reconstruction: Jingguang Tunnel, Zhenghong City Commercial Plaza

The project of SDIC Nine Buildings and Zhengzhou Fire Emergency Center

On July 20, many places were seriously affected. Zhenghong City Commercial Plaza had accumulated water as deep as 1 meter, and many citizens were trapped in the shopping mall. The Ministry of Human Resources and Armed Forces of Jinshui District organized 50 cadres and workers and 50 militiamen to drive along with the armed police. More than 10,000 people were evacuated by boats and excavators. The staff of Acrel Henan District Office responded to the needs of various projects in Zhengzhou 24 hours a day, and went to the site to conduct on-site surveys. Project plans such as the Beijing-Guangzhou Tunnel and Zhenghong City Commercial Plaza have been implemented a few days ago. Acrel formulates a plan based on the actual situation of the specific project, immediately allocates the goods and sends them to the disaster area to help reconstruction. Acrel provides product solutions such as smart capacitors, microcomputer protection integrated measurement and control devices, and remote prepayment systems.


Service guarantee: escort the reconstruction of power supply in the disaster area

The products and solutions of Acrel Co., Ltd. are mainly used in the reconstruction projects of Henan Metro Line 3 and Line 4, Beijing-Guangzhou Tunnel, SDIC Building 9, Zhenghong City Commercial Plaza, and Zhengzhou Fire Emergency Center. All product technology and installation issues can be consulted with relevant personnel of Acrel. The engineers of Acrel Zhengzhou Office can deal with product technology, installation, debugging and other issues at any time, and assist various departments in Henan to restore power supply as soon as possible.

Working Group: Urgent establishment of Henan Rescue Working Group

Person in charge: Zhang Shiquan 18701996616

Person in charge of delivery: Zong Shousong 18860995151

Person in charge of Henan District: Zhu Jianhua 13598866062

Service Contact: Zhu Ke 18702102013

When one side is in trouble, all sides can help! Acrel has always shouldered the sacred mission of corporate citizenship, actively giving back to the society, taking on more social responsibilities when the motherland needs it, fully demonstrating the responsibility and strength of the national brand, and helping the motherland in the same boat. All employees of Acrel will continue to cooperate closely and work together to ensure that they win the big and tough battle of emergency and resumption of work, and strive to realize the reconstruction of the disaster area as soon as possible and restore the vitality of the past.

Together with "Yu" to tide over the difficulties

Henan fighting!!


Back To The List

Related Projects & News

March 20 2024

Welcome to HANNOVER MESSE 2024

Acrel hereby sincerely invite you and your company representatives to visit our booth at HANNOVER MESSE 2024

March 12 2024

Welcome to Middle East Energy 2024

Acrel hereby sincerely invite you and your company representatives to visit our booth at Middle East Energy 2024 in Dubai, Middle East Energy is the region's comprehensive energy exhibition and conference, exploring energy products and solutions across Cr

newR
newL

GET YOUR FREE QUOTE

We will contact you within 24 hours.

X